To be completed prior to handover:
- minor paint touch ups
- feature wall in living room to be painted
- data points to be installed
- phone point to be installed
- extra powerpoint in garage to be installed
- NBN connection plates to be fit off
- front side window to be replaced (cracked)
- weather seals to be installed (front door)
- air con duct casing in bed 2 to be replaced (broken)
- plug for bath to be provided
- appliances to be installed (on day of settlement)
Progress Pics from today:
INTERNAL:
![]() |
| Laundry |
![]() |
| Laundry |
![]() |
| WIR Bed 4 |
![]() |
| Main bathroom shower cubicle |
![]() |
| Main bathroom |
![]() |
| Main bathroom |
![]() |
| Main bathroom |
![]() |
| Main bathroom |
![]() |
| Main bathroom |
![]() |
| Bed 3 & WIR |
![]() |
| Bed 3 |
![]() |
| Bed 2 WIR |
![]() |
| Bed 2 |
![]() |
| Bed 2 & 3 |
![]() |
| Passage |
![]() |
| Linen cupboard |
![]() |
| Linen cupboard |
![]() |
| Passage |
![]() |
| Pantry |
![]() |
| Kitchen & door to garage |
![]() |
| Kitchen |
![]() |
| Kitchen/Dining |
![]() |
| Kitchen/Living |
![]() |
| Kitchen/Living |
![]() |
| Theatre & front hallway |
![]() |
| Front hallway |
![]() |
| Kitchen |
![]() |
| Living |
![]() |
| Dining/Living/Kitchen |
![]() |
| Dining/Living |
![]() |
| Ensuite |
![]() |
| Ensuite shower cubicle |
![]() |
| Ensuite |
![]() |
| Master WIR |
![]() |
| Master & ensuite |
![]() |
| Master & ensuite |
![]() |
| Ensuite |
![]() |
| Ensuite & WIR |
EXTERNAL: