A new beginning....Our build journey
Total Pageviews
Showing posts with label
whirlybird
.
Show all posts
Showing posts with label
whirlybird
.
Show all posts
Saturday, 28 February 2015
Roof Completed - 28 Feb 2015
The roof is finally done, and 2 x solar panels (hot water) & whirlybird are installed. Bricks have been delivered to the site and some plumbing (water pipes) has been installed. Front door frame has also been installed with opaque side window.
Older Posts
Home
Subscribe to:
Posts (Atom)