Total Pageviews

Showing posts with label whirlybird. Show all posts
Showing posts with label whirlybird. Show all posts

Saturday, 28 February 2015

Roof Completed - 28 Feb 2015

The roof is finally done, and 2 x solar panels (hot water) & whirlybird are installed. Bricks have been delivered to the site and some plumbing (water pipes) has been installed. Front door frame has also been installed with opaque side window.