We have the keys!!! Finally. This week has been hectic to say the least and on top of that we have no internet at the house for another couple of weeks so updated this blog has been difficult.
When I was reading other people's building blogs I became so frustrated that when they got keys the blog finished. I will endeavor to not do that and will update as soon as I can!
Thanks for reading so far :)
Total Pageviews
Thursday, 28 May 2015
Wednesday, 13 May 2015
Practical Completion Inspection (PCI) & progress pics
So, today my son & I met Site Supervisor 'S' on site to complete the Practical Completion Inspection. This means that essentially everything is done bar a few little things and a few paint touch ups etc. We were pretty happy with the house and am now looking forward to settlement and finally getting the keys.
To be completed prior to handover:
- minor paint touch ups
- feature wall in living room to be painted
- data points to be installed
- phone point to be installed
- extra powerpoint in garage to be installed
- NBN connection plates to be fit off
- front side window to be replaced (cracked)
- weather seals to be installed (front door)
- air con duct casing in bed 2 to be replaced (broken)
- plug for bath to be provided
- appliances to be installed (on day of settlement)
Progress Pics from today:
INTERNAL:
EXTERNAL:
To be completed prior to handover:
- minor paint touch ups
- feature wall in living room to be painted
- data points to be installed
- phone point to be installed
- extra powerpoint in garage to be installed
- NBN connection plates to be fit off
- front side window to be replaced (cracked)
- weather seals to be installed (front door)
- air con duct casing in bed 2 to be replaced (broken)
- plug for bath to be provided
- appliances to be installed (on day of settlement)
Progress Pics from today:
INTERNAL:
Laundry |
Laundry |
WIR Bed 4 |
Main bathroom shower cubicle |
Main bathroom |
Main bathroom |
Main bathroom |
Main bathroom |
Main bathroom |
Bed 3 & WIR |
Bed 3 |
Bed 2 WIR |
Bed 2 |
Bed 2 & 3 |
Passage |
Linen cupboard |
Linen cupboard |
Passage |
Pantry |
Kitchen & door to garage |
Kitchen |
Kitchen/Dining |
Kitchen/Living |
Kitchen/Living |
Theatre & front hallway |
Front hallway |
Kitchen |
Living |
Dining/Living/Kitchen |
Dining/Living |
Ensuite |
Ensuite shower cubicle |
Ensuite |
Master WIR |
Master & ensuite |
Master & ensuite |
Ensuite |
Ensuite & WIR |
EXTERNAL: