We can finally see the light at the end of the tunnel.....the Practical Completion Inspection (PCI) has been scheduled for 14th May 2015. This means that essentially hand over will be 7 days after this (21st May 2015), if there are no major issues or hold ups.
This morning we had the opportunity to go through the house and bits and pieces are being completed each day. It feels so slow atm for some reason though :)
Today we found that the following had been done, for the most part:
- most painting internal & external completed (except for feature wall & a few other things)
- bath installed
- all door handles installed
- taps in all bathrooms/laundy
- Ceasarstone benchtops installed in kitchen
- sliding door installed between bed 2 & 3
- all tiling in bathrooms/laundry completed
- shelving in pantry, linen & WIR's being completed (while we were there)
- ducted heating ducts & control panel installed
- air con ducts installed
- front portico rendered (not painted)
- beam above garage door painted (undercoat)
- beam above portico painted (undercoat)
- front door painted (external)
We are both really happy with colours of tiles and painting etc. It is so difficult to know what it's all going to look like when you choose from a little sample (nearly a year ago mind you!). The front door external colour isn't quite what we thought it would be.... not quite dark enough to match the window frames, but we can always re-paint it if it bothers us too much later on! We are particularly happy with the feature tiles in the bathrooms. I ended up changing the wall colour to a lighter colour at the last minute and am really happy I did (thanks mum!). All good so far :)
EXTERNAL:
|
Front portico |
|
Front portico (master bed window) |
|
Front door |
|
Front door |
|
Front portico |
|
Front of house |
|
Front of house |
|
Front of house |
|
Front of house |
INTERNAL:
|
Door handles (internal) |
|
Air con duct |
|
Main bathroom sink/tap |
|
Main bathroom shower |
|
Main bathroom |
|
Main bathroom |
|
Laundry |
|
Kitchen cabinets |
|
Kitchen cabinets |
|
Kitchen sink (undermount) & tap |
|
Kitchen |
|
Kitchen |
|
Heating vent & controller (front passage) |
|
Front door & handle |
|
Front door & handle |
|
Ensuite shower |
|
Ensuite shower |
|
Ensuite shower |
|
Ensuite shower |
|
Ensuite toilet |
|
Ensuite vanity |
|
Ensuite shower head & tiling |
|
Pantry |
|
Kitchen cabinets |
|
Kitchen sink |
|
Kitchen cabinets |
|
Kitchen cabinets |
|
Kitchen splashback |
|
Kitchen cabinets & splashback |
|
Front door (internal) |