Total Pageviews

Wednesday 22 April 2015

Practical Completion Inspection (PCI) scheduled & Progress pics

We can finally see the light at the end of the tunnel.....the Practical Completion Inspection (PCI) has been scheduled for 14th May 2015. This means that essentially hand over will be 7 days after this (21st May 2015), if there are no major issues or hold ups.

This morning we had the opportunity to go through the house and bits and pieces are being completed each day. It feels so slow atm for some reason though :) 

Today we found that the following had been done, for the most part:

- most painting internal & external completed (except for feature wall & a few other things)
- bath installed
- all door handles installed
- taps in all bathrooms/laundy
- Ceasarstone benchtops installed in kitchen
- sliding door installed between bed 2 & 3
- all tiling in bathrooms/laundry completed 
- shelving in pantry, linen & WIR's being completed (while we were there)
- ducted heating ducts & control panel installed
- air con ducts installed
- front portico rendered (not painted)
- beam above garage door painted (undercoat)
- beam above portico painted (undercoat)
- front door painted (external)

We are both really happy with colours of tiles and painting etc. It is so difficult to know what it's all going to look like when you choose from a little sample (nearly a year ago mind you!). The front door external colour isn't quite what we thought it would be.... not quite dark enough to match the window frames, but we can always re-paint it if it bothers us too much later on! We are particularly happy with the feature tiles in the bathrooms. I ended up changing the wall colour to a lighter colour at the last minute and am really happy I did (thanks mum!). All good so far :)

EXTERNAL:

Front portico

Front portico (master bed window)

Front door

Front door

Front portico

Front of house


Front of house

Front of house

Front of house



INTERNAL:

Door handles (internal)

Air con duct

Main bathroom sink/tap

Main bathroom shower

Main bathroom

Main bathroom

Laundry

Kitchen cabinets

Kitchen cabinets

Kitchen sink (undermount) & tap

Kitchen

Kitchen

Heating vent & controller (front passage)

Front door & handle

Front door & handle

Ensuite shower

Ensuite shower

Ensuite shower

Ensuite shower

Ensuite toilet

Ensuite vanity

Ensuite shower head & tiling

Pantry

Kitchen cabinets

Kitchen sink

Kitchen cabinets

Kitchen cabinets

Kitchen splashback

Kitchen cabinets & splashback

Front door (internal)


No comments: